The inside of the building was painted a neutral Gray, then given a
heavy charcoal wash (blotted with tissue) and drybrushed a neutral gray/Barnwood
mix. Hirst Dirt was scrubbed on where each floor insert meets its walls.
Finished inserts from above:
Attic and barn upper storage.
Second floor.
First floor.
Ground floor. Difficult to reach down 150mm to get at that figure coming in the front door.
Was I able to solve the problem when I put the building together and glued it to the
base?
NEXT: Oh yeah!
Nice looking building, love this work...and this blog, very creative!
ReplyDeleteThanks again, Phil.
Delete