Friday, October 24, 2014

Derelict Building 3: Overhead Interior Views

The finished third and second floor inserts. They had to be individually made to line up with their corresponding door openings. Added terrain scatter using wood bits and accessories. Dirt debris is Vermiculite. Thinned matte medium was then painted on to seal everything and "dust" was quickly sprinkled on (I milled some Vermiculite in an old coffee grinder). Finally, a watered down coat of gray was painted on for more aging.

The inside of the building was painted a neutral Gray, then given a heavy charcoal wash (blotted with tissue) and drybrushed a neutral gray/Barnwood mix. Hirst Dirt was scrubbed on where each floor insert meets its walls.  

Finished inserts from above:

Attic and barn upper storage.

Second floor.

First floor.

Ground floor. Difficult to reach down 150mm to get at that figure coming in the front door. Was I able to solve the problem when I put the building together and glued it to the base?

NEXT: Oh yeah!
 

2 comments: